Shoulder resurfacing underway on I-29 in Sioux Falls

By: 
Staff report

Shoulder resurfacing work is underway on Interstate 29 from exit 84 (at Interstate 90) for approximately one mile north toward 259th Street in Sioux Falls. The inside and outside shoulders in both the northbound and southbound lanes will be resurfaced. Additional work on the project includes cold milling asphalt concrete, embankment surfacing, and replacement of highway signage.

Interstate traffic will be reduced to a single lane while operations are being conducted on the shoulders and guardrail. Traffic control measures will be in place to help guide motorists through the work zone. Motorists are reminded to use caution and reduce their speed while workers and equipment are present. 

The prime contractor on the $7.8 million project is Bituminous Paving, Inc. of Ortonville, Minn. The anticipated overall completion date for this project is Friday, Nov. 1.  

 

Category:

The Brandon Valley Journal

 

The Brandon Valley Journal
1404 E. Cedar St.
Brandon, SD 57005
(605) 582-9999

Email Us

Facebook Twitter

Please Login for Premium Content